Roof Flashings · RF-105
RF-105 Gable Trim for Sandwich Panel Roofs
RF-105 Gable Trim is the coded Jawdah roof flashing that runs along the sloping side edge of a sandwich panel roof, the verge, covering the last panel edge and closing the junction between the roof and the gable wall below.
- Code
- RF-105
- Position
- Sloping roof side edge (verge)
- Joins
- Roof panel and gable wall
- Dimensions
- Confirmed per project

Overview
Quick answer
RF-105 Gable Trim is a formed metal flashing fixed along the verge of a sandwich panel roof. It covers the edge of the last roof panel, turns down over the top of the gable wall cladding, and stops wind-driven rain from entering between roof and wall. Verges face high wind suction, so the trim is fixed at close spacing. Jawdah confirms the RF-105 profile per project.
Overview
The verge: where roof and gable wall meet
A gable trim works on two buildings at once: it finishes the roof edge and caps the top of the gable wall.
RF-105 is the fifth code in the Jawdah Roof Flashings range. Its girth, leg lengths, gauge and material are not published; this page explains what a gable trim closes, why verges are wind-critical and what Jawdah needs to confirm RF-105.
On a pitched building, the two end walls rise to a triangle, the gable, and the roof panels finish along its sloping top. At that verge, the edge of the last roof panel, its side joint and the top of the wall cladding all meet in one line, open to rain blown sideways across the roof.
RF-105 Gable Trim closes that line. Its top leg lies on the roof panel, its face turns down over the edge, and its lower leg laps over the gable wall cladding. Water on the roof stays on the roof; water on the wall face runs down past the junction instead of into it.
Because it bridges roof and wall, RF-105 must be detailed against both panels: the high-rib roof profile on top and the wall panel joint below, such as a Semi-Corrugated Wall Panel. Jawdah confirms the RF-105 section for each gable.

How it works
Why verges need careful fixing
As general guidance, wind suction on a roof is highest at its edges and corners, and the verge is a long exposed edge. A loose verge trim lifts first and then lets the wind under the panel edge. Verge trims are therefore fixed at closer spacing set by the engineer, into both the roof panel and the wall, and the side lap of the last panel is detailed so the trim has a solid line to fix to. Where the verge meets the ridge, the trim runs under or is sealed to the end of the ridge cap.
Types
RF-105 compared with the other roof edges
A roof has three outside edges, each with its own code.
| Edge | Code | Runs | Water |
|---|---|---|---|
| Verge / gable | RF-105 Gable Trim | Up the slope | Kept on the roof, off the wall junction |
| Ridge | RF-103 External Ridge Cap | Along the apex | Shed to both slopes |
| Eave | RF-106 Eave Trim / RF-101 Eave Gutter | Along the low edge | Dropped clear or collected |
Applications
Roof and wall panels RF-105 joins
RF-105 sits on the edge rib of the 3-Rib Roof Panel or the 5-Rib Roof Panel, and laps onto the gable wall panels. State both panel types, the roof pitch and the colour of roof and wall faces; where they differ, say which one the trim should match.
Installation
Fitting order at the gable
Clad the gable wall and lay the roof panels up to the verge first. Fit RF-105 from the eave upward so each upper length laps the one below, seal the laps, and fix along both legs. Finish at the ridge by tucking or sealing the trim to the ridge cap end, and at the eave by stopping it neatly over the eave trim or gutter end.
Selection pitfalls
Gable trim mistakes
Verge problems usually show as rattling trims or wet gable walls.
- Fixing the verge at the same spacing as the roof field
- Lapping lengths downhill over uphill
- No seal where the gable trim meets the ridge cap
- Lower leg too short to cover the wall cladding top
- Detailing the trim for the roof panel only, ignoring the wall joint
Choosing
Ordering RF-105
Measure each verge along the slope, from eave to ridge, and mark it RF-105. Give pitch, roof and wall panel types and colours. Order it with the RF-103 External Ridge Cap and eave items in the same Roof Flashings package so the corners are detailed together.
Technical
Closer look


Specifications
RF-105 data status
No technical data sheet covers Jawdah flashings, so RF-105 values are confirmed in the quotation.
| Property | Value |
|---|---|
| Code and name | RF-105 Gable Trim |
| Range | Roof Flashings |
| Girth and leg lengths | Not specified in the supplied data sheet |
| Material and thickness | Not specified in the supplied data sheet |
| Colour | Confirmed per project |

Key facts
- RF-105 Gable Trim is a coded item in the Jawdah Roof Flashings range.
- RF-105 runs along the verge of a sandwich panel roof and laps over the gable wall.
- Verge trims face high wind suction and are fixed at closer spacing.
- RF-105 must suit both the roof panel profile and the gable wall panel.
- Jawdah confirms RF-105 girth, material and colour per project.
RFQ / BOQ checklist
- Roof plan and gable elevations with verges marked RF-105
- Verge length along the slope
- Roof pitch
- Roof panel variant: 3-rib or 5-rib
- Gable wall panel type and joint
- Roof and wall colours, and which the trim should match
- Wind exposure of the site
Resources
Further chapters in preparation
Technical resources
Technical documentation is being prepared for this product.
Projects using this product
Project references are being prepared.
Compatible systems
Information on compatible systems for this product is being prepared.
Our technical team can share the current information on request.Ask the technical team
FAQ
Frequently asked questions
A coded Jawdah roof flashing that closes the sloping side edge of a sandwich panel roof and laps over the top of the gable wall.
Yes, both terms describe the trim along the sloping side edge of a pitched roof where it meets the gable wall.
Wind suction is highest at roof edges and corners, so the verge trim is fixed more closely, at a spacing set by the engineer.
Yes. Its lower leg laps onto the gable wall cladding, so the wall panel joint and colour must be stated.
Along the slope from eave to ridge for each verge. Give the total per colour.
No. Girth, leg lengths, material and thickness are confirmed by Jawdah per project.

Next step
Detail your gables with RF-105
Send the gable elevations, roof plan and pitch. The Jawdah team will confirm RF-105 and the ridge and eave items around it with the panels.