Jawdah Industrial Co. Ltd.

Roof Flashings · RF-105

RF-105 Gable Trim for Sandwich Panel Roofs

RF-105 Gable Trim is the coded Jawdah roof flashing that runs along the sloping side edge of a sandwich panel roof, the verge, covering the last panel edge and closing the junction between the roof and the gable wall below.

Code
RF-105
Position
Sloping roof side edge (verge)
Joins
Roof panel and gable wall
Dimensions
Confirmed per project
RF-105 Gable Trim, 3D render of the folded steel flashing profile for sandwich panel roofs

Overview

Quick answer

RF-105 Gable Trim is a formed metal flashing fixed along the verge of a sandwich panel roof. It covers the edge of the last roof panel, turns down over the top of the gable wall cladding, and stops wind-driven rain from entering between roof and wall. Verges face high wind suction, so the trim is fixed at close spacing. Jawdah confirms the RF-105 profile per project.

Overview

The verge: where roof and gable wall meet

A gable trim works on two buildings at once: it finishes the roof edge and caps the top of the gable wall.

RF-105 is the fifth code in the Jawdah Roof Flashings range. Its girth, leg lengths, gauge and material are not published; this page explains what a gable trim closes, why verges are wind-critical and what Jawdah needs to confirm RF-105.

On a pitched building, the two end walls rise to a triangle, the gable, and the roof panels finish along its sloping top. At that verge, the edge of the last roof panel, its side joint and the top of the wall cladding all meet in one line, open to rain blown sideways across the roof.

RF-105 Gable Trim closes that line. Its top leg lies on the roof panel, its face turns down over the edge, and its lower leg laps over the gable wall cladding. Water on the roof stays on the roof; water on the wall face runs down past the junction instead of into it.

Because it bridges roof and wall, RF-105 must be detailed against both panels: the high-rib roof profile on top and the wall panel joint below, such as a Semi-Corrugated Wall Panel. Jawdah confirms the RF-105 section for each gable.

RF-105 Gable Trim

How it works

Why verges need careful fixing

As general guidance, wind suction on a roof is highest at its edges and corners, and the verge is a long exposed edge. A loose verge trim lifts first and then lets the wind under the panel edge. Verge trims are therefore fixed at closer spacing set by the engineer, into both the roof panel and the wall, and the side lap of the last panel is detailed so the trim has a solid line to fix to. Where the verge meets the ridge, the trim runs under or is sealed to the end of the ridge cap.

Types

RF-105 compared with the other roof edges

A roof has three outside edges, each with its own code.

Roof edge codes (general guidance)
EdgeCodeRunsWater
Verge / gableRF-105 Gable TrimUp the slopeKept on the roof, off the wall junction
RidgeRF-103 External Ridge CapAlong the apexShed to both slopes
EaveRF-106 Eave Trim / RF-101 Eave GutterAlong the low edgeDropped clear or collected

Applications

Roof and wall panels RF-105 joins

RF-105 sits on the edge rib of the 3-Rib Roof Panel or the 5-Rib Roof Panel, and laps onto the gable wall panels. State both panel types, the roof pitch and the colour of roof and wall faces; where they differ, say which one the trim should match.

Installation

Fitting order at the gable

Clad the gable wall and lay the roof panels up to the verge first. Fit RF-105 from the eave upward so each upper length laps the one below, seal the laps, and fix along both legs. Finish at the ridge by tucking or sealing the trim to the ridge cap end, and at the eave by stopping it neatly over the eave trim or gutter end.

Selection pitfalls

Gable trim mistakes

Verge problems usually show as rattling trims or wet gable walls.

  • Fixing the verge at the same spacing as the roof field
  • Lapping lengths downhill over uphill
  • No seal where the gable trim meets the ridge cap
  • Lower leg too short to cover the wall cladding top
  • Detailing the trim for the roof panel only, ignoring the wall joint

Choosing

Ordering RF-105

Measure each verge along the slope, from eave to ridge, and mark it RF-105. Give pitch, roof and wall panel types and colours. Order it with the RF-103 External Ridge Cap and eave items in the same Roof Flashings package so the corners are detailed together.

Technical

Closer look

Approved photography of the product and its finish.
RF-105 Gable Trim, 3D render of the folded steel flashing profile for sandwich panel roofs
Gable trim flashing profile (RF-105) for sandwich panel roofs

Specifications

RF-105 data status

No technical data sheet covers Jawdah flashings, so RF-105 values are confirmed in the quotation.

RF-105 Gable Trim data status
PropertyValue
Code and nameRF-105 Gable Trim
RangeRoof Flashings
Girth and leg lengthsNot specified in the supplied data sheet
Material and thicknessNot specified in the supplied data sheet
ColourConfirmed per project

Key facts

  1. RF-105 Gable Trim is a coded item in the Jawdah Roof Flashings range.
  2. RF-105 runs along the verge of a sandwich panel roof and laps over the gable wall.
  3. Verge trims face high wind suction and are fixed at closer spacing.
  4. RF-105 must suit both the roof panel profile and the gable wall panel.
  5. Jawdah confirms RF-105 girth, material and colour per project.

RFQ / BOQ checklist

  • Roof plan and gable elevations with verges marked RF-105
  • Verge length along the slope
  • Roof pitch
  • Roof panel variant: 3-rib or 5-rib
  • Gable wall panel type and joint
  • Roof and wall colours, and which the trim should match
  • Wind exposure of the site

Resources

Further chapters in preparation

In preparation
  • Technical resources

    Technical documentation is being prepared for this product.

  • Projects using this product

    Project references are being prepared.

  • Compatible systems

    Information on compatible systems for this product is being prepared.

Our technical team can share the current information on request.Ask the technical team

FAQ

Frequently asked questions

  • A coded Jawdah roof flashing that closes the sloping side edge of a sandwich panel roof and laps over the top of the gable wall.

  • Yes, both terms describe the trim along the sloping side edge of a pitched roof where it meets the gable wall.

  • Wind suction is highest at roof edges and corners, so the verge trim is fixed more closely, at a spacing set by the engineer.

  • Yes. Its lower leg laps onto the gable wall cladding, so the wall panel joint and colour must be stated.

  • Along the slope from eave to ridge for each verge. Give the total per colour.

  • No. Girth, leg lengths, material and thickness are confirmed by Jawdah per project.

Next step

Detail your gables with RF-105

Send the gable elevations, roof plan and pitch. The Jawdah team will confirm RF-105 and the ridge and eave items around it with the panels.